Pipeline Conditioning
MRR was contracted to condition 20 miles of new 8” steel pipe. MRR installed and operated odorant injection equipment at the client site to complete the process. To minimize costs to project, we employed the MRR Odor Tracker to continuously monitor the mercaptan levels in the natural gas stream.
LOCATION
what we did
Pipeline Conditioning