MRR — Preloader Demo

WHERE STANDARDS ARE SET™

North America’s leading end-to-end gas odorization partner since 1996.
Engineer and Implement

System Design

We engineer, fabricate, and commission turnkey odorization systems built around your site conditions and operating requirements.
Supply and Maintain

Operations & Field Service

We supply and deliver odorant, and condition and service your systems — keeping gas reliably detectable from a line's first day to its last.
Verify and Validate

Risk Management

We identify risks before they impact your system through compliance audits, assessments, and odor detectability validation.
Trusted Across North America
Our Clients

Who We Work With

Gas Utilities

From system design through ongoing maintenance, explore how we support gas utilities with specialized services that keep odorization infrastructure compliant and reliable.

Refineries & Midstream

In a complex regulatory environment, explore how we support operators across midstream and refinery systems where odorization reliability and documentation are critical.

Renewable Natural Gas

As renewable natural gas expands, odorization plays a critical role. We help RNG operators integrate it into existing infrastructure, safely and on schedule.

Engineering & EPC

We work closely with engineering consultants, supporting the design, validation, and long-term performance of the odorization systems they specify for their clients.
Safety

Safety Shouldn’t Be Second-Guessed

Protecting People

Supporting the safety of the technicians, operators, and communities who rely on natural gas systems every day.

Protecting the Environment

Supporting operators with safe odorant handling practices and rapid response capabilities to minimize environmental impact.
Certifications, Compliance, and Memberships
Certifications & Compliance
CSA
Certified Equipment
CRN
Registered Across Canada
TSSA
Ontario Registered
TDG
Dangerous Goods Compliant
US DOT
Registered Carrier
ISNetworld® & Veriforce
Verified Contractor
Association Memberships
AGA
American Gas Association
CGA
Canadian Gas Association
KGA
Kentucky Gas Association
LGA
Louisiana Gas Association
MEA
Midwest Energy Association
NGA
Northeast Gas Association
NYSEARCH
Associate Member #001

MRR equipment and services support operator compliance with federal odorization requirements, including 49 CFR 192.625 (US) and CSA Z662 (Canada)

Client Stories

Participating in the safe delivery of natural gas at every stage. From local utilities to the largest gas operators in North America.

Natural gas odorization equipment being decommissioned across four stations at a site in Nebraska.
Four-Station Retirement, 2,300 Gal.
Retiring odorization infrastructure across four stations, recovering 2,300 gallons of odorant for continued service.
Upward view of a modern high-rise apartment tower in Manhattan with reflective glass windows and protruding balconies against a blue sky.
Manhattan Odor Fade Resolution
Odor fade in the new gas piping of a Manhattan high-rise, eliminated in two weeks with no odorant intentionally released to the neighborhood.
Storage tanks being decommissioned following a lightning-strike fire at a natural gas site in Alabama.
Three-Tank Decommissioning
Stabilizing and decommissioning three tanks damaged in a suspected lightning-strike fire, four days from mobilization to closure.
On-site incineration equipment used to drain and treat over-odorized liquid from a 12-inch transmission line in Quebec
12-Inch Odorant Drain and Incineration
Excavating, tapping, and draining liquid odorant from a 12-inch transmission line — two-week response with on-site incineration.
1980s-era underground storage tank being cut down and removed at a site in Michigan.
1980s Tank Removal
Removing a 1980s-era underground bulk odorant tank too large to transport — treated and cut down for removal entirely on site.
1,000-gallon modular gas odorization building installed at a site in Georgia.
1,000-Gallon Modular Building
A 1,000-gallon modular odorization building, fabricated at the MRR shop and set on its foundation as a single integrated unit.
Technician in blue coveralls with reflective safety striping adjusting a temporary gas odorization skid and tank at a fenced outdoor site.
Emergency Temporary Odorization
Maintaining odorization compliance for three months while a failed permanent system was redesigned, fabricated, and installed.
Natural gas pipeline conditioning equipment at a shopping mall construction site in New Jersey.
New Jersey Mall Gas Line Conditioning
Conditioning new gas lines inside a mall under construction — with continuous monitoring that surfaced previously undetected leaks.
36-inch natural gas transmission line during a pipeline pickling operation at a site in Texas.
36-Inch, 10-Week Pickling at 850 psig
Conditioning a new 36-inch, 64-mile transmission pipeline over 10 weeks of continuous online pickling at 850 psig.
C1D1-rated dual-odorizer trailer, a custom-built mobile gas odorization unit, at an industrial site in Illinois.
C1D1 Dual-Odorizer Trailer
A dual-odorizer trailer with integrated filtration, flow telemetry, and C1D1-rated systems — 20 weeks from order to delivery.
Refinery storage tank being decommissioned at an industrial site in Illinois.
5,000-Gallon Tank Decommissioning
Replacing a 5,000-gallon ethyl mercaptan tank at a refinery, with 1,800 gallons of odorant held and returned to service.
Row of portable flare units operating at night to generate flow for an inline pipeline inspection campaign in northern Ontario
Six-Week Flow Generation
Portable flow generation supporting an inline inspection campaign in northern Ontario — 12 to 16 hours a day across six weeks.
MRR enclosure tent reading "Your End-to-End Gas Odorization Partner," connected to hoses and blower equipment for an atmospheric-isolated soil excavation, with safety cones in the foreground.
Large Mercaptan Spill Remediated
More than 400 odor calls, seven figures a day in potential lost revenue, and mercaptan underground beside active waterways.
Small tan modular gas odorization building connected to storage tanks and piping at a rural renewable natural gas site, with utility poles in the background.
RNG Building, 3-Month Commission
A modular RNG odorization building, manufactured off-site and commissioned at a Quebec injection point on a three-month schedule.
Renewable natural gas odorization system engineered and commissioned at a site in Ontario.
5-Month RNG Commission
Custom design, manufacturing, and commissioning of a renewable natural gas odorization system, delivered in five months end to end.

30 Years

200+ Utilities

10 Provinces, 49 States

1,000+ Sites a Year

Engineered Equipment and Products

Made by MRR

We design and manufacture specialized equipment and chemical products that are available for resale. Explore our offerings to elevate your systems.

Leave Nothing to Chance

For your next job, trust the team that has been setting the standard in gas odorization since 1996.